SAP CPQ Implementation Services From Discovery to Go-Live

We implement SAP CPQ around the way your team actually sells, then hand over a system your own people can run.

Isidora and Milos - SAP CPQ Experts

What an SAP CPQ Implementation Actually Covers

An SAP CPQ implementation turns your product catalog, pricing logic and approval rules into a working quoting system on your own SAP CPQ tenant. In practice it covers discovery, product and pricing modeling, quote documents and approvals, integration with your SAP landscape, testing, user training and go-live. How long it takes depends on scope and data quality, so we estimate after discovery, not before.

We run that work end to end. SAP CPQ is the only thing we do, and our team started at CallidusCloud, the company that built SAP CPQ before SAP acquired it.

How an SAP CPQ Implementation Project Runs With Us

1. Discovery and scope

We work through your quoting process, product structure, pricing logic and approval chain with the people who use them, and agree what goes into the first phase. Our notes on what good SAP CPQ discovery looks like show the level of detail we aim for.

2. Solution design

We decide how products, pricing, rules and quote documents will be modeled in SAP CPQ, which quote engine you will run on, and what stays standard. Integration design happens here too, not at the end of the project.

3. Build and test

We configure in your sandbox tenant and test with real quotes, edge cases and the exceptions your sales team meets, not only the happy path. Your team reviews working features as we go, so a requirement that does not fit the product surfaces early.

4. Go-live and handover

We plan the move to production, train your administrators and sales users, and stay close after go-live. Your team gets documentation and a proper knowledge transfer before we step back, and we can stay on under ongoing consulting and support if you prefer.

Isidora Buza Cvetic, Solution Architect at Solvetect Consulting

What to Define Before the Project Starts

The most expensive problems in SAP CPQ projects come from decisions nobody made early. We help you settle these six areas first, and our SAP CPQ implementation checklist covers each of them in more detail.

1.

Goals and Success Measures

Which quoting problems the project must fix, how you will measure the result after go-live, and who owns that outcome on the business side.

2.

First-Phase Scope

Which sales processes, regions and product lines go live first, and what waits for a later phase. A clear boundary protects both the budget and the date.

3.

Products and Configuration

Which products are configurable, which are standalone, how bundles behave and which combinations are technically valid. A clean catalog makes the rest of the build easier.

4.

Pricing and Discounts

Every pricing rule at rule level: volume, customer tier, bundle and regional logic, with exceptions and effective dates. A slide deck is not enough to configure from.

3.

Approvals

Discount thresholds, margin floors, deal-size tiers and who signs off at each level, including the path for non-standard requests.

4.

Integrations and Data Ownership

Which system owns products, prices and customers, and how a quote becomes an order. Our SAP CPQ integration services cover this side of the project.

Who Needs to Be on the Project

A small, named team on your side moves a project faster than a large steering group. These are the roles we ask for.

1.

Business Owner

One person with the authority to decide scope and settle disagreements between sales, finance and IT. Without this role, decisions wait.

2.

Pricing and Product Owners

The people who know how prices and products really work, including the exceptions. They validate the rules and sign off test results.

3.

Future CPQ Administrators

Involve them from the start. They learn the system while it is being built, which makes the handover much easier.

4.

IT and Integration Lead

Someone who knows your SAP landscape and can arrange access, connections and data extracts on time.

Where SAP CPQ Implementations Usually Go Wrong

Pricing logic that lives in people's heads

When rules are configured from how the team thinks pricing works, the gap shows up later as wrong quotes in the field. We document the rules before we build them.

Integration left for the end

Data that does not map between systems is cheap to fix in design and expensive in testing. One example: the prepackaged sales order integration with SAP S/4HANA is built for Quote 2.0, so the integration plan can decide the quote engine. That is one reason weak integration planning hurts good projects so often.

No plan for moving to production

SAP CPQ gives you a sandbox and a production tenant, with no ABAP-style transport between them. Configuration moves through Deploy / Send Changes packages or a tenant copy run by SAP, so we settle how that will work before the build, not at cutover.

Users who first see the system at go-live

Sales teams adopt what they helped shape. We bring users into testing early and prepare the sales team for adoption well before launch, because training alone will not fix a process nobody agreed on.

Miloš Stefanović, Solution Architect at Solvetect Consulting

Why Teams Choose Solvetect for SAP CPQ Implementation

If you are comparing firms, our questions for an implementation partner are a good way to test any team, including us.

1.

We Come From the Product

Our team started at CallidusCloud, the company that built SAP CPQ, and moved to SAP after the acquisition. We have 7+ years of hands-on work with this one product.

2.

SAP CPQ Is All We Do

SAP CPQ is not one of our services. It is the only one, so every implementation gets the full depth of the team.

3.

Architects on Your Project

Isidora Buza Cvetic and Miloš Stefanović are both solution architects. You work with them directly, on business design as well as IronPython scripting and integrations.

4.

Close to the Community

Isidora serves on the board of the Configuration Workgroup, where SAP customers, partners and SAP configuration development teams meet. Read more about our role at CWG.

Industries That Benefit From SAP CPQ Implementation

We support a wide range of industries, enhancing sales efficiency, accuracy, and customer satisfaction through tailored SAP CPQ solutions. Here are some most notable ones:

WHAT OUR CLIENTS HAVE TO SAY ABOUT US

Recent testimonials from our clients

SAP CPQ Implementation Questions We Get Asked

What does an SAP CPQ implementation include?
Discovery, solution design, product and pricing modeling, quote documents, approvals, integration with your SAP systems, testing, training and go-live support. The exact scope depends on what goes into the first phase.

How long does an SAP CPQ implementation take?
It depends on scope, the number of integrations, whether configurable products are in the first phase and how clean your data is. We give an estimate after discovery. Our article on what actually sets the date explains the main gates.

What does an SAP CPQ implementation cost?
The budget follows the same drivers as the timeline: scope, integrations, product complexity and data quality. We do not quote a figure before discovery, and our breakdown of what drives the budget shows why.

Do we need to decide between Quote 1.0 and Quote 2.0 before we start?
Yes, early. The prepackaged sales order integration with SAP S/4HANA is built for Quote 2.0, and the SAP guide states that Quote 1.0 is not supported, so the choice affects the integration plan as well as the build.

Can you take over an implementation that has stalled?
Yes. We start by reviewing what has been built and why it stopped, then keep what works and fix the rest. Our SAP CPQ project rescue page explains the approach.

What happens after go-live?
Your administrators take over with documentation and training, and we remain available if you need us. Teams that want a second line can stay with us under SAP CPQ consulting and support, and an SAP CPQ Health Check suits a review once the system has been running for a while.

Planning an SAP CPQ Implementation, or Restarting One?

Tell us what you are quoting and what has to change. A free consultation is the quickest way to an honest view of scope, and a Health Check suits systems that are already live.